| Name | Status Date | Status | Mod Type | Approval Ref | Issue No. | Description | Comments | Engineer | Payment received? | Approval Date | |
|---|
| GTFC, PEGASUS QUIK | 22-03-2023 | 9. FULLY APPROVED | MAAN | 2958 | 1 | Sail Repair | Wing Sail from G-CCOK | Roger Pattrick | Yes | 2023-03-22 | View |
| BZRP, PEGASUS QUANTUM 15-912 | 16-09-2024 | AWAITING FINAL INSPECTION SHEET | MAAN | 3027 | a | Sail Repair | Wing must not be flown until approval note has been issued and owner notified. | Roger Pattrick | Yes | | View |
| CCTR, SKYRANGER SWIFT 912(1) | 19-03-2026 | 8. FINAL REVIEW, 9. FULLY APPROVED | MAAN | 3062 | 1 | Swift Conversion | Updating to Issue 2 - minor changes. No need for any action by owner. | Vivek Chanda | Yes | 2025-12-18 | View |
| RAFR, SKYRANGER 912S(1) | | | MAAN | 1919 | 2 | G-RAFR, BMAA/HB/410, completion | up-issued to correct IAS units | | | 2017-09-06 | View |
| OEZI, EASY RAIDER J2.2(2) | | | MAAN | 1689 | 2 | G-OEZI, BMAA/HB/216, completion | Up-issued for new ASI calibration | | | 2019-05-17 | View |
| CFNX, IXESS 13 (MODIFIED - TANARG 912 TRIKE) | 04-03-2022 | REMOVED | MAAN | 2799 | 1 | Modified Tanarg Trike, Rotax 912 and Medway Ecoprop Fitted | These mods have been removed, see build MAAN 2144 | Roger Pattrick | Yes | 2020-08-12 | View |
| JMRT, IKARUS C42 FB80 BRAVO | 19-02-2026 | 9. FULLY APPROVED | MAAN | 3068 | 1 | Throttle lever extension | The Ulster Flying Club 14370 | Lloyd Smith | Yes | 2026-02-18 | View |
| CCEH, SKYRANGER 912(2) | | | MAAN | 1978 | | Coolant radiator cabin heater | suspended | | | | View |
| DIDY, THRUSTER T600N (450) JAB | 29-05-2025 | 9. FULLY APPROVED | MAAN | 3032 | 1 | Weld repair to fuselage sub-frame | Straight to issue 1 | Vivek Chanda | Yes | 2025-05-29 | View |
| CCII, SAVANNAH VG JABIRU | 14-05-2025 | 9. FULLY APPROVED | MAAN | 2996 | 1 | Replacing extruded bars of wing spar attachments (Service Bulletin I.C.P. 031) | Signed Flight Release Certificate received 14/05/2025. | Robert Mott | N/A | 2024-06-24 | View |
| UNJA, PIPISTREL ALPHA BCAR-S 164 | 24-12-2025 | 9. FULLY APPROVED | MAAN | 3063 | 1 | Installation of E-Props Durandal 3-Blade propeller | Series mod. W&B form will need to be signed before test flying can begin.
W&B Signed and returned, W&B to only be used for flight testing. | Lloyd Smith | Yes | 2025-12-24 | View |
| CEEO, FLIGHT DESIGN CTSW | 15-03-2021 | ABANDONED | MAAN | 2876 | A | Repair - Top of Fuselage, Fin, Bulkhead, Windscreen & Port Wing Tip | Sept 2022 - REPAIR FINISHED BY AIRMASTERS LTD (DAI/9972/21) | Mark Bailey | No | | View |
| CBIB, FLIGHT DESIGN CT2K | 16-02-2026 | 7. PROCESSING - FINAL | MAAN | 3073 | | Engine mount repair | Send together with MAAN 3059 | Vivek Chanda | Yes | | View |
| CCOK, PEGASUS QUIK | 02-02-2023 | CANCELLED | MAAN | 2958 | A | Sail Repair | Sail was used transferred to G-GTFC. | | No | | View |
| MZGO, PEGASUS QUANTUM 15-912 | 24-12-2025 | INSPECTION SHEET SENT, 6. WITH APPLICANT | MAAN | 3076 | A | Sail Repair
Repair Scheme received from Pennine Flexwing Services | Sail Repair - Awaiting Application RESOLVED
Repair Scheme received from Pennine Flexwing Services | Lloyd Smith | Yes | | View |
| MZDE, PEGASUS QUANTUM 15 | 01-10-2020 | 6. WITH APPLICANT | MAAN | 2856 | A | Sail Repair | Repair and Inspect Only
Sail going onto a donor aircraft - reg to be advised
NOT APPROVED FOR FLIGHT | Roger Pattrick | | | View |
| JUGE, EV-97 TEAMEUROSTAR UK | 17-02-2022 | CANCELLED | MAAN | 2912 | 1 | Ballast Bag For Passenger Seat - Solo Operation Only | REMOVED & CANCELLED FOR G-JUGE ONLY (26/04/2023) | Roger Pattrick | Yes | 2022-02-17 | View |
| CGRC, QUIKR | 18-11-2025 | ON HOLD | MAAN | 3070 | A | Skirt Material Change | Released for flight test | Roger Pattrick | Yes | 2025-11-17 | View |
| CHLZ, SKYRANGER SWIFT 912(1) | 11-11-2022 | 9. FULLY APPROVED | MAAN | 2442 | 2 | G-CHLZ, BMAA/HB/626, completion | Reclassification to Microlight | Robert Mott | Yes | | View |
| HOTA, EV-97 TEAMEUROSTAR UK | | | MAAN | 2674 | 1 | Repair | Rear bulkhead replacement by CT Aviation | | | 2017-08-18 | View |
| MRJJ, PEGASUS QUIK | 13-06-2024 | 9. FULLY APPROVED | MAAN | 3003 | | Prop Pitch Change | Question sent to owner & inspector regarding lock wiring - RESOLVED | Robert Mott | Yes | 2024-06-13 | View |
| NOTS, SKYRANGER 912S(1) | 02-04-2026 | 4. PROCESSING - DRAFT, QUESTIONS WITH APPLICANT | MAAN | 3085 | | Skyranger Classic to Swift Conversion | Query- details of new instrumentation | Thomas Dean | Yes | | View |
| PIVI, VIRUS SW 127 912S(1) | 17-03-2026 | 9. FULLY APPROVED | MAAN | 3064 | 1 | Composite repair to Fuselage underbelly | Query with inspector/workshop regarding layup and curing process. | Thomas Dean | Yes | 2026-03-17 | View |
| SINN, EV-97 EUROSTAR SL MICROLIGHT | 13-03-2026 | 4. PROCESSING - DRAFT, AWAITING INFORMATION | MAAN | 3080 | | Port Wing Rear Drag Spar Bolt Replacement | Queries raised with manufacturer to define suitable repair procedure | Thomas Dean | No | | View |
| NIXX, SKYRANGER SWIFT 912S(1) | 22-08-2025 | 9. FULLY APPROVED | MAAN | 3051 | 1 | Pushrod Nose leg Steering | Payment request sent. Received.
FRC Received 20/06/2025, signed, 14/07/2025. | Lloyd Smith | Yes | 2025-08-22 | View |
| OTJH, PEGASUS QUANTUM 15-912 | 18-11-2025 | 9. FULLY APPROVED | MAAN | 3057 | 1 | Wing Repair | Payment Recieved and damage clarification recieved
WID_212854_7A01F0_89 | Lloyd Smith | Yes | 2025-11-13 | View |
| CIIA, QUIKR | | | MAAN | 2720 | 1 | Wing Sail Repair | Paid | | | 2018-08-09 | View |
| CBIB, FLIGHT DESIGN CT2K | 24-09-2025 | 7. PROCESSING - FINAL | MAAN | 3059 | | Flap Controller and Indicator | ON HOLD - awaiting MAAN 3073 | Robert Mott | Yes | | View |
| CNAP, EUROFOX 3K | 17-02-2026 | 4. PROCESSING - DRAFT | MAAN | 3084 | | Reinforcement of Rudder Pedal to Torque Tube Joints | NOT YET IMPLEMENTED | Robert Mott | No | | View |
| MZLM, CYCLONE AX2000 | 07-07-2021 | 9. FULLY APPROVED | MAAN | 2869 | 1 | Replacement Tail Skins in Xlam | Not Yet Approved | Roger Pattrick | Yes | 2021-07-07 | View |
| CBHG, BLADE (MODIFIED) | 21-08-2018 | CANCELLED | MAAN | 2728 | A | Wing Sail Repair | Not Yet Approved
Inspection Only
Went SSDR | Roger Pattrick | No | 2018-09-13 | View |
| CETF, FLIGHT DESIGN CTSW | 29-09-2022 | 6. WITH APPLICANT | MAAN | 2944 | A | Coolant Radiator Shutter | NOT FITTED 4/07/2023 | Mark Bailey | No | | View |
| CEGJ, QUIK GT450 | 27-09-2024 | 9. FULLY APPROVED | MAAN | 3023 | 1 | Wing Sail Repair | Must Not Be Flown Until Full Approval Issued
Awaiting payment balance, only £22.00 received so far. 25/09/2024
£66 Balance paid 25/09/2024 by phone
| Roger Pattrick | Yes | 2024-09-25 | View |
| EGHP, IKARUS C42 FB80 | 12-09-2019 | ABANDONED | MAAN | 2791 | A | Adaption of Factory Hand Operated Rudder & Throttle Controls | Mod cancelled 10/09/2020. Will need new application to re-instate as current owner different to owner detailed in original application. | Robert Mott | No | 2019-11-22 | View |
| FROM, IKARUS C42 FB100 | 21-06-2024 | CANCELLED | MAAN | 2950 | | E-Prop DUR-3-170-C4-T | MOD CANCELLED - 175 prop fitted instead (as per BM68) | Robert Mott | No | | View |
| CCEB, THRUSTER T600N 450 | 07-06-2016 | 6. WITH APPLICANT | MAAN | 2617 | A | Alternative lift strut extrusion | Manufacture and Inspection Only
Not Yet Approved | | No | 2017-11-09 | View |
| RATT, EUROFOX 915iS | 28-04-2025 | 9. FULLY APPROVED | MAAN | 3033 | 1 | G-RATT, reclassification | MAAN complete - New Permit to Fly Cert now required before flight can commence | Robert Mott | | 2025-04-24 | View |
| HNGE, IKARUS C42 FB80 | 11-03-2026 | 6. WITH APPLICANT | MAAN | 3061 | B | C42 Main Tube Repair | Issue A 15/09/2025 issued, Approved by RP.
Issue B Under Review, Date TBC. | Lloyd Smith | Yes | | View |
| SUMO, SKYRANGER NYNJA 912S(1) | 27-05-2022 | 9. FULLY APPROVED | MAAN | 2772 | 3 | G-SUMO, BMAA/HB/714, completion | Issue 3 - 600kg | Robert Mott | Yes | 2022-05-27 | View |
| CCNR, SKYRANGER 912(2) | | | MAAN | 1763 | 2 | G-CCNR, BMAA/HB/315, completion | Issue 2 to correct units in ASI placard | | | | View |
| RHAM, SKYRANGER 582(1) | | | MAAN | 2026 | 2 | G-RHAM, BMAA/HB/482, completion | Issue 2 to correct ASI units | | | 2017-09-22 | View |
| CLID, SKYRANGER NYNJA 912S(1) | 27-04-2023 | 9. FULLY APPROVED | MAAN | 2815 | 2 | G-CLID, BMAA/HB/685, completion | ISSUE 2 DRAFT: Change from FIXED-WING LANDPLANE to MICROLIGHT | Robert Mott | Yes | 2023-04-27 | View |
| NOTS, SKYRANGER 912S(1) | | | MAAN | 1922 | 2 | G-NOTS, BMAA/HB/352, completion | Issue 2 Correction of instrument and ASI units | | | 2017-05-19 | View |
| CFDO, FLIGHT DESIGN CTSW | 26-05-2021 | 9. FULLY APPROVED | MAAN | 2748 | 2 | Tru-Trak/BendixKing autopilot | Issue 2 Change of controller unit from Trutrak to BendixKing | | Yes | 2021-05-26 | View |
| RILA, FLIGHT DESIGN CTSW | 02-10-2023 | 9. FULLY APPROVED | MAAN | 2915 | 2 | BendixKing [Tru-trak] Autopilot | Issue 2 - Updated parameters | Robert Mott | Yes | 2023-10-01 | View |
| GBRI, SKYRANGER NYNJA 912S(1) | 15-12-2022 | 9. FULLY APPROVED | MAAN | 2747 | 2 | Home Built Completion BMAA/HB/704 | Issue 2 - Fixed wing landplane to microlight | Robert Mott | Yes | 2022-12-15 | View |
| OTUM, SKYRANGER NYNJA 912S(1) | 30-07-2025 | | MAAN | 2691 | 2 | G-OTUM, BMAA/HB/692, completion | Issue 2 - Conversion to microlight | Roger Pattrick | Yes | 2025-07-24 | View |
| HECT, FLIGHT DESIGN CTLS 600 UK | 30-05-2023 | 9. FULLY APPROVED | MAAN | 2960 | 1 | Transfer from CAA Part-21 Ptf to BMAA non Part-21 PtF | Issue 1: G-HECT | Robert Mott | Yes | 2023-05-30 | View |
| CJVK, SKYRANGER NYNJA 912iS(1) | 25-03-2024 | 9. FULLY APPROVED | MAAN | 2671 | 2 | G-CJVK BMAA/HB/2671 Completion | Issue 1 - Completion (01/08/2018)
Issue 2 - Andair fuel pumps (25/03/2024) | Robert Mott | Yes | 2024-03-25 | View |
| MVIG, SHADOW SERIES BD | 01-04-2021 | 6. WITH APPLICANT | MAAN | 2861 | A | Misc Modifications and Conversion to Shadow CD | Inspection Only - Not to be flown. | Roger Pattrick | Yes | | View |