| Name | Status Date | Status | Mod Type | Approval Ref | Issue No. | Description | Comments | Engineer | Payment received? | Approval Date | |
|---|
| CCBJ, SKYRANGER SWIFT 912S(1) | 23-04-2026 | 9. FULLY APPROVED | Minor | 2435 | NYI | Replacement Corbeau Seat Harness | | Thomas Dean | Yes | | View |
| CCDY, SKYRANGER 912(2) | 10-03-2026 | 9. FULLY APPROVED | Minor | 2429 | | Ignitech Ignition Modules | | Thomas Dean | Yes | 2026-03-09 | View |
| CCNP, FLIGHT DESIGN CT2K | 27-04-2026 | 9. FULLY APPROVED | Minor | 2436 | NYI | Skyflar Strobe Installation | | Thomas Dean | Yes | 2026-04-27 | View |
| CDBV, SKYRANGER 912S(1) | 29-04-2026 | 9. FULLY APPROVED | Minor | 2423 | | Ignitech Ignition Modules | Paid £32 04/02/2026 further payments may be required
Request for £63 sent 24/02/2026 CB RESOLVED | Thomas Dean | Yes | 2026-04-29 | View |
| CDKK, PEGASUS QUIK | 06-05-2026 | 9. FULLY APPROVED | Minor | 2428 | | Electrical wiring modification- aux power, iPad GPS, landing light, heated clothing, pilot aware & radio change | | Thomas Dean | Yes | 2026-05-06 | View |
| CGLO, QUIKR | 02-04-2026 | 9. FULLY APPROVED | Minor | 2430 | | Ignitech Ignition Modules | | Thomas Dean | Yes | 2026-04-02 | View |
| CKGS, IKARUS C42 FB80 | 10-03-2026 | 9. FULLY APPROVED | Minor | 2419 | A | Ignitech Ignition Modules | | Thomas Dean | Yes | 2026-03-09 | View |
| CLEV, IKARUS C42 FB80 | 19-03-2026 | 9. FULLY APPROVED | Standard Minor | 03938 | 5 | 102 Radio Installation | | Thomas Dean | Yes | 2026-03-19 | View |
| CLEV, IKARUS C42 FB80 | 19-03-2026 | 9. FULLY APPROVED | Standard Minor | 03939 | 7 | 104 Transponder Installation | | Thomas Dean | Yes | 2026-03-19 | View |
| CMWC, PIPISTREL ALPHA BCAR-S 164A | 08-05-2026 | 9. FULLY APPROVED | MAAN (Series) | 3063 | 2 | E-Props Durandal 3 Blade GA pitch propeller Mod
| | Thomas Dean | Yes | 2026-05-08 | View |
| DDDY, QUIK GT450 | 13-02-2026 | 9. FULLY APPROVED | Standard Minor | | | 101 Radio Installation | | Thomas Dean | Yes | 2026-02-13 | View |
| DDDY, QUIK GT450 | 13-02-2026 | 9. FULLY APPROVED | Standard Minor | | | 106 Strobe Installation | | Thomas Dean | Yes | 2026-02-13 | View |
| DDDY, QUIK GT450 | 13-02-2026 | 9. FULLY APPROVED | Standard Minor | | | 111 Soft Start Module | | Thomas Dean | Yes | 2026-02-13 | View |
| EPEE, JA-400 SKYLEADER 400 | 30-04-2026 | 6. WITH APPLICANT, INSPECTION SHEET SENT | Minor | 2427 | A | Fuel flow sensor/transducer | | Thomas Dean | Yes | | View |
| ICWT, PEGASUS QUANTUM 15-912 | 09-04-2026 | 9. FULLY APPROVED | Minor | 2421 | | Aerofoil Sleeving to A-Frame Uprights and Kingpost | | Thomas Dean | Yes | 2026-04-09 | View |
| JAYS, SKYRANGER 912S(1) | 17-04-2026 | 9. FULLY APPROVED | Minor | 2431 | | Ignitech Ignition Modules | | Thomas Dean | Yes | 2026-04-17 | View |
| MPHY, IKARUS C42 FB80 BRAVO | 28-05-2026 | 9. FULLY APPROVED | Minor | 2424 | 1 | Non-structural bonded XLAM patches | | Thomas Dean | Yes | 2026-05-28 | View |
| NOTS, SKYRANGER SWIFT 912S(1) | 14-05-2026 | 5. DRAFT REVIEW | MAAN | 3085 | NYI | Skyranger Classic to Swift Conversion, instrument panel update, and overstitching of wing fabric seams | | Thomas Dean | Yes | | View |
| PIVI, VIRUS SW 127 912S(1) | 17-03-2026 | 9. FULLY APPROVED | MAAN | 3064 | 1 | Composite repair to Fuselage underbelly | Query with inspector/workshop regarding layup and curing process. | Thomas Dean | Yes | 2026-03-17 | View |
| SINN, EV-97 EUROSTAR SL MICROLIGHT | 05-05-2026 | 6. WITH APPLICANT | MAAN | 3080 | A | Port Wing Rear Drag Spar Bolt Replacement | Draft cleared | Thomas Dean | Yes | 2026-05-08 | View |
| TUGD, EUROFOX 3K | 01-04-2026 | 6. WITH APPLICANT, INSPECTION SHEET SENT | Minor | 2420 | | Elevator stop weld repair | | Thomas Dean | Yes | | View |
| TYGR, SKYRANGER SWIFT 912S(1) | 29-04-2026 | 9. FULLY APPROVED | Minor | 2426 | | STROBE LIGHT INSTALLATION | | Thomas Dean | Yes | 2026-05-07 | View |
| UPTA, SKYRANGER 912S(1) | 29-04-2026 | 9. FULLY APPROVED | Minor | 2425 | A | Installation of MGL Blaze EMS-2 Engine Information System and MGL Vega MAG-1 Compass | | Thomas Dean | Yes | 2026-04-30 | View |